Nail together the side walls, then square them with the plywood side panels. Overhang the panels 3/8 in. at the front—this will hide the gap at the corner when you hang the doors.
Join the two sides with the top and bottom plates and rim joists. The sides, top and bottom are all mirror images of each other except for the top front rim joist, which is set down 1/2 in. from the top so it stops the doors (Photo 1). Use screws to fasten the framework together except in the front where fasteners will be visible—use 2-1/2-in. casing nails there.
Screw the 4x4 footings to the bottom plates, then nail on the plywood base.
Build the roof on your workbench. Start with an L-shaped 2x4 frame, then add the nailers, soffit, sheathing and trim. Shingle with cedar or asphalt shingles.
Cut and screw together the two pairs of rafters, then nail on the fascia and ridge boards. Nail on the roof sheathing and the soffit, butting the corners together (Photo 2). Screw on the collar ties at the points shown in Figure A, then screw on the front and rear nailers. Nail the roof trim on, staple on a layer of roofing felt, then shingle the roof. If you use cedar shingles, fasten them with narrow crown staples or siding nails. Leave 1/8-in. to 1/4-in. gaps between cedar shingles for expansion, and nail a strip of aluminum flashing across the ridge under the cap shingles.
Tip the shed upright, then set the roof on, aligning the front collar tie with the front rim joist and centering it side to side (Photo 3). Nail the cedar trim to the sides, aligning the 1x3s on the sides with the overhanging edge of plywood along the front edge. Glue and screw on the
Nail on the front trim piece, aligning it with the horizontal side battens. Attach flashing and felt to the front panel, then cover it with cedar shakes (Photo 4).
Finally, construct the doors (see Figure A detail), cut the hinge mortises (see below) and hang the doors. Leave a 1/8-in. gap between the doors and trim along the top. Paint or stain if desired, then set the shed against the house on several inches of gravel. Add or take away gravel under the footings until the shed is tight against the siding and the gap above the doors is even. Screw the shed to the studs in the wall to keep it from tipping. Drill two 1/2-in. holes for the screws through the plywood near the rim joists, then loosely fasten the shed to the wall with 2-1/2-in. screws and large fender washers so the shed can move up and down when the ground freezes and thaws.
Mark the hinge locations on the door jamb, then on the door, less 1/8 in. for clearance at the top of the door. Separate the hinge leaves, then align the edge of the leaf with the edge of the door or jamb. Predrill and fasten the leaf, then cut along all three edges with a razor knife to about the same depth as the hinge leaf (Photo 1).
Remove the hinge and make a series of angled cuts to establish the depth of the mortise Photo 2). Turn the chisel over and clean out the chips using light hammer taps.
Holding the chisel with the beveled front edge against the wood, chip out the 1/4-in. sections. Check the fit of the hinge leaf and chisel out additional wood until the leaf sits flush.
If the hinges don"t fit back together perfectly when you hang the door, tap the leaves up or down (gently) with a hammer.
Original article and pictures take http://www.familyhandyman.com/DIY-Projects/Home-Organization/Tool-Storage/garden-closet-storage-project/Step-By-Step site
">
Комментариев нет:
Отправить комментарий